County Fee Schedule

All Departments - Copying & Printing

Copies (except Clerk of Court) 0.30
FOIA Requests - Electronic (Email) no charge
FOIA Requests - Printed Documents 0.30 per page and a prorated hourly rate of no less than $15.00
Videotape or USB 10.00

Airport - Hangar And Tie Down Rent

Hanger Row ‘A’ - per month 140.00 - 200.00
Hanger Row ‘B’ - per month 165.00 - 200.00
Hanger Row ‘C’ - per month 165.00 - 200.00
Monthly Tie Down Fee 35.00
Over-Night Ramp Fee
Single Engine 10.00
Twin Engine 40.00
Jet 50.00
Crop-duster fee - per ton of fertilizer 1.50
Credit Card Convenience Fee 3% of charges

Animal Control

Impound Fee
Initial Fee 1st Offense
Initial Fee 2nd Offense
-
25.00
50.00
Impound Fee (after initial fee) - per day 10.00
Quarantine Fee - Dog bite and/or Court case 50.00
Return to Owner - Basic Fee 25.00
Rabies Vaccine 10.00
Spay/Neuter 85.00
Dog Running at Large 25.00
Transport for Surrender 25.00
Adoption Fees
Cats 85.00
Dogs 85.00
Credit Card Convenience Fee 3% of charges

Assessor’s Office

Mobile Home Moving Permit 15.00
CAMA Data - Entire County 500.00
Specific CAMA Data - per account 0.03
Parcel Shape Files - Entire County 500.00
Parcel Shape Files - Quarter County 125.00
Parcel Shape Files - Half County 250.00
Parcel Shape Files - 3/4 County 375.00
Additional Whole County Layer - per file 100.00
Additional Quarter County Layer - per file 25.00
Additional Half County Layer - per file 50.00
Additional 3/4 County Layer - per file 75.00
GIS Maps
34x44 30.00
22x34 25.00
11x17 10.00
8 1/2 x 11 5.00
County & District Maps
22x34 10.00
11x17 5.00
8 1/2 x 11 3.00
Qpublic Prints
Map 1.00
Aerial Map 3.00
House Photo 3.00
Property Cards - per page 0.30
Copies
Per page 0.30
Patriot Property Cards 1.00
Parks, Electrical Outlets - per usage 40.00

Clerk of Court

Letter/Legal Size Copies - per page 0.25
Ledger Size Copies - per page 0.50
Plat Filing 25.00

Community Development

Building (Construction) Permit Fees - Fees are for new construction, additions, alterations, and renovations, including work done to manufactured and modular homes.

Building Construction Evaluation Residential:
Building valuation data is based on average valuations determined for most building, and is in conjunction with International Building Code (IBC) Section 109.3.

Heated Space 90.00
Unfinished Space 30.00
Garages 40.00
Porches & Decks 20.00
Construction Costs
$0 - $5,000 $35 permit fee + $35 fee for plans review (as required)
$5,001 - $10,000 $35 fee for the first $5,000 plus $6 for each additional $1,000 + $50 fee for plans review (as required)
$10,001 - $50,000 $50 fee for the first $10,000 plus $5 for each additional $1000 + $100 fee for plans review (as required)
$50,001 - $100,000 $350 fee for the first $50,000 plus $4.50 for each additional $1000 + $150 fee for plans review (as required)
$100,001 - $500,000 $560 fee for the first $100,000 plus $4.00 + $300 fee for plans review (as required)
More than $500,000 $2,000 fee for the first $500,000 plus $2.50 for each additional $1000 + $1000 fee for plans review (as required)

Building Construction Evaluation Commercial: Building valuation data is based on average valuations determined for most building, and is in conjunction with International Building Code (IBC) Section 109.3.

Heated Space 150.00
Unfinished/Storage 60.00
Construction Costs
$0 - $5,000 $50 permit fee + $50 fee for plans review (as required)
$5,001 - $10,000 $50 fee for the first $5,000 plus $10 for each additional $1,000 + $55 fee for plans review (as required)
$10,001 - $50,000 $75 fee for the first $10,000 plus $8 for each additional $1000 + $125 fee for plans review (as required)
$50,001 - $100,000 $500 fee for the first $50,000 plus $6.50 for each additional $1000 + $175 fee for plans review (as required)
$100,001 - $500,000 $760 fee for the first $100,000 plus $6 + $500 fee for plans review (as required)
More than $500,000 $3,000 fee for the first $500,000 plus $4 for each additional $1000 + $1500 fee for plans review (as required)

Residential Speciality: Mechanical, Plumbing, Electrical, Roofing, and Gas Permits
Note: Additional inspections are $20 EACH

$0 - $10,000 $25 permit fee – Includes one inspection.
$10,001 - $50,000 $25 permit fee for the first $10,000 plus $4.50 for each additional $1000 or fraction thereof. Includes two inspections.
$50,001 - $100,000 $260 permit fee for the first $50,000 plus $4 for each additional $1000 or fraction thereof. Includes four inspections.
$100,001 - $500,000 $460 permit fee for the first $100,000 plus $3.50 for each additional $1000 or fraction thereof. Includes four inspections.
More than $500,000 $1660 permit fee for the first $500,000 plus $3.00 for each additional $1000 or fraction thereof. Includes four inspections.
Other Building Permit Fees
Building Moving/Relocation Permit $35
Demolition Permits Storage Building/Garage $30
1 Story Residential $50
2 Story Residential $75
1-2 Story Commercial $140
3+ Story (Residential & Commercial) $275
Plus $20 each additional story
Swimming Pool Permit Based on Building Permit Evaluation
Re-Inspections $20 each additional (All Permits)
Working Without a Permit Double the price of the permit not acquired
Electrical Upgrade $32
Zoning Fees
Temporary Use Permit $35
Appeal of Administrative Decision (BZA) $200
Variance Request (BZA) $175 Residential
$225 Commercial
Rezoning Request (Planning Commission) $400
Zoning Verification and Compliance Letter $20
Planning and Zoning Land Development Fees
Routine Plat/Boundary Survey Approval $15 per lot
Minor Subdivision $15 per lot
Plats requiring Planning Commission Approval $300
Major Subdivision – Sketch Plan $250
Major Subdivision – Preliminary Plat $250
Major Subdivision – Final or Bonded Plat $250
Large Acreage Private Drive Subdivisions – Prelim $250
Large Acreage Private Drive Subdivision – Final $250
Land Development and Zoning Site Plan Review $100 for two reviews -
$200 for 3rd and subsequent
Plot Plans requiring Flood and Elevation Review $30 per lot
Manufacture Home Parks
(Planning Commission)
$200
Cell Towers $450
Commercial/Industrial Group Development $500 (50,000 sqft or less);
$750 (50,001 – 100,000 sqft);
and $1000 (100,001sqft and up)
Manufactured/Mobile Home Fees
Manufactured Home Set Up Permit $100 Installation Fee (Per State Law)
$50 Inspections (Site, Installation and Final)
$20 Zoning Verification $170 TOTAL
Re-Inspections $20
Mobile Home De-title and Inspection $115

Coroner’s Office - Report and Transport Fees

Coroner’s Report 35.00
Toxicology Report 75.00
Autopsy Report 300.00
Cremation Permit 25.00
Coroner Case Photos - Each 2.00
Cremains Return Fee 300.00
Transport from Nursing Home Facilities 125.00

Delinquent Tax Collector

Title Search on property sold and not redeemed 150.00
Deed cost for property sold and not redeemed 50.00
Return Check Fee 25.00
Copies per sheet 0.30

Detention Center

Finger Print Card 10.00
Inmate Prescription 5.00

Emergency Medical Services

ALS1 Non-Emergent 522.60
ALS1 Emergent 752.60
ALS2 Emergent 723.55
BLS Non-Emergent 80.00
BLS Emergent 361.80
Specialty Care 723.55
Ground Mileage - per mile 9.00
Lifeline - per month 37.00

Parks and Recreation

Athletics & Programs
Tackle Football 35.00
Baseball 35.00
Softball 25.00
All Other Sports 20.00
Gymnastics 5 and under - per month 20.00
Gymnastics 6 and over 25.00
Dance 5 and under - per month 30.00
Dance 6 and over - per month 35.00
After School & Summer Camp
After School First Child - $35.00 per week
Each Additional Child - $25.00 per week
Summer Camp First Child - $60.00 per week
Each Additional Child - $30.00 per week
Fitness (per month)
Group Fitness 20.00
Soul Line Dance 20.00
Zumba 20.00
Jenkinsville/Monticello/Mitford Community Fitness Room 10.00
Fairfield County Community Fitness Center (Drawdy Park) 20.00
Group Fitness and Community Fitness Center 30.00
Pool
Open Swim $3.00 per day
Swim Lessons (session includes 8 classes in a 2-week period) $40.00 per session
Rentals
Jenkinsville/Monticello/Mitford Community Center $100.00 deposit
$50.00 per hour
Ballfield $75.00 per usage
Ballfield Lights $25.00 per usage
Concession Stand $50.00 per usage
Parks, Electrical Outlets $40.00 per usage

Public Works

Additional Materials for Driveway
Note: Subject to change based on cost of materials
$125 per 8-foot stick of concrete culvert

Solid Waste

Transfer Station Charge for Commercial Waste - per ton
Note: Subject to change
63.00
Waste Permit 15.00
Waste Tire Permit - per ton 120.00

Wood Chipping Facility

Annual Permit Fee 15.00 required annually
Yard Debris per ton 30.00 per ton

Transit

Local Routes, within the city limits of Winnsboro 2.00
Local Routes, outside of the city limits of Winnsboro 3.00
Blythewood 3.00
Columbia, Irmo, Chester 5.00
Lexington, Lancaster, Camden, Newberry 10.00

Treasurer’s Office

Return Check Fee 25.00
Credit Card Convenience Fee 3% of charges

Schedule of Fees for services performed by the Fairfield county Fire Service

Site/Building Fire Plan Review Services
(depending on size and or complexity)
$100.00 - $400.00
Site Plan Review - Commercial Site: $100.00
Site Plan Review – Residential Site: (excluding 1- and 2-family Residential) $100.00
Structural Fire Plan Review (Building Addition)
15,999 square feet or less $400.00
16,000 square feet or more $ .025 per square foot
Tenant Finish, Remodels or Minor Alterations Fire Plan Review $100.00
* If revisions are required, no charge is assessed for the first resubmittal. $100.00 fee will be charged for subsequent resubmittals.*
Fire Sprinkler/Fire Alarm Plan Review Services (depending on size or devices) $100.00 plus
* If revisions are required, no charge is assessed for the first resubmittal. $100.00 fee will be charged for subsequent resubmittals.*
Fire & Life Safety Inspection Services (depending on corrective actions taken) $0.00 – $150.00
Annual Fire and Life Safety Inspection $0
First Reinspection for non-compliance (if corrections are made) $0
First Reinspection for non-compliance (if corrections are not made) $100.00
Second and subsequent reinspections for non-compliance $150.00
Fines for emergent and/or repetitive Life Safety violations (depends upon severity) $100.00 – $500.00
Examples
Common hazards (such as misuse of extension cords) (2nd offense) $100.00
Exit/emergency lights not operational (2nd offense) $100.00
Obstructed emergency exits (2nd offense) $200.00
Tampering with fire protection systems (2nd offense) $200.00
Fire protection systems not operational (2nd offense) $200.00
Fire protection systems not operational (3rd offense) $500.00
Nuisance calls to Fire Department Fee (per calendar year)
First 3 confirmed system nuisance alarm calls $0.00
For the 4th $100.00
For the 5th $150.00
For the 6th $200.00
False Fire Alarm Fee (Per calendar year)
First 3 confirmed system false alarm calls $0.00
For the 4th $200.00
For the 5th $300.00
For the 6th $500.00
Operational Fire Permits (as required by adopted fire code, depending on length of permit) $50.00 -$500.00
Examples
Amusement buildings – Operation of a Special Amusement Building $50.00
Carnivals and fairs – Conduct a carnival or fair $50.00
Blasting Permits (One month) $50.00
Blasting Permit (Three months) $100.00
Blasting Permit (Annual) $500.00
Explosive Magazine (Annual) (each magazine) $50.00
Fireworks Display Permit (One month)(Indoor) $250.00
Fireworks Display Permit (Annual) (Indoor) $100.00
Fireworks Display Permit (Annual)(Outdoor) $250.00
Fireworks Sales (Stand) (Temporary – 90 days) $100.00
Fireworks Sales (Stand) (Annual) $100.00
Fireworks Sales (Store) (Annual) $100.00
Fireworks Storage Magazine (Annual) (each magazine) $100.00
Fire hydrants and valves
Use or operate fire hydrants or valves intended for fire suppression purposes
$50.00
Mobile food preparation vehicles
Mobile food preparation vehicles equipped with appliances that produce smoke or grease-laden vapors
$50.00
Temporary membrane structures and tents
Operate an air-supported temporary membrane structure, a temporary special event structure or tent having an area in excess of 400 square feet, including exceptions.
$50.00
Construction Fire Permits (as required by adopted fire code, depending on specific function permitted and square footage) $50.00 to $300.00
Examples
Automatic fire-extinguishing systems – Installation, modification, or removal of a fire sprinkler system, kitchen hood fire extinguishing system or alternate fire suppression system
Fire Sprinkler Systems:
0 – 999 square feet $50.00
1,000 - 2,499 square feet $75.00
2,500 – 9,999 square feet $100.00
10,000 – 49,999 square feet $200.00
50,000 or more square feet $300.00
Other automatic fire extinguishing systems: $50.00
Includes kitchen hood fire suppression systems, and alternate fire suppression systems defined in 2018 IFC, Chapter 9.
Compressed gases – Where compressed gases in use or storage exceed amount listed in 2018 IFC Table 105.6.8, a permit is required to install, repair damage to, abandon, remove, place temporarily out of service, or close or substantially modify a compressed gas system, including exceptions. $200.00
Fire alarm and detection systems and related equipment
Installation of or modification to fire alarm and detection systems and related equipment.
0 – 999 square feet $50.00
1,000 – 2,499 square feet $75.00
2,500 – 9,999 square feet $100.00
10,000 – 49,000 square feet $200.00
50,000 or more square feet $300.00
High-piled combustible storage
Installation of or modification to a structure exceeding 500 square feet, including aisles, for high-piled combustible storage.
$100.00
Special event structure – Single construction permit required to erect and take down a temporary special event structure per 2018 IFC Section 3105. $100.00